Case Study -
Smithills School, Bolton, Greater Manchester

Published: February 3rd 2026
Client:

Smithills School, Bolton

Build Size:

24M x 18M - 16 Bay Modular building

Sector:

Education

Product:

Modular Buildings

Lead Time:

12 weeks from order to handover

Overview

Smithills School were in urgent need of additional teaching space to provide accommodation for a pupil referral unit comprising 4 classrooms and 2 food tech facilities with partitions offering flexibility in room size.

The 16-bay modular building was to be sited in an area that encroached on an existing staff car park. We replaced this facility with a new car park area fully secured with controlled gate access for both vehicles and pedestrians.

The Client

Smithills School, Bolton is an inclusive, caring and friendly school that prides itself in offering an environment where every child is respected and encouraged to reach their potential and shine.

The Challenge

The two major challenges Springfield faced were the need to design, manufacture, transport and install the 16 modular units within a tight timeframe along with managing the groundworks and utilities connections.

  • Time Constraints – Springfield were able to manage a 12 week turnaround from order to handover, including a 5 week on-site fit-out.
  • Challenging Utilities Connections – the food tech classrooms required significant utility connections to provide the power required.
Smithills 3
Smithills 1

What Springfield Did

  • Collaboration: Worked with Rachel Cannon at Smithills School to understand her precise needs and discussed the many options available both inside and out
  • Full Turnkey Service: Provided a full turnkey package handling all aspects of the job after planning permission. This included groundworks, utility connections, landscaping, access ramps, full fit-out including food-tech equipment, & air conditioning
  • Coordination: Managed the full project synchronising all the required activities and functions to ensure an on-time delivery within the tight time scale.

Design Features

  • Cedar clad exterior
  • Anthracite Facia
  • Fully Glazed Aluminium entry door
  • Air Conditioning
  • Non-slip vinyl flooring
  • Food Tech Equipment & furniture
  • Access ramp x 2
  • Kitchen fit out
  • Suspended ceiling
Smithills 2

Related Case Studies


  • Smithills School, Bolton, Greater Manchester

    Sector:

    Product: Springfield delivered a 16 bay modular building that gave Smithills School urgently needed classroom and food technology space, while also replacing lost parking with a secure new car park. The entire project, from design through to fit out and utilities, was completed in just twelve weeks with minimal disruption to the school.

    Read More

  • SpaceM SEMH for Park School, Chipping Norton...

    Sector:

    Product: Springfield delivered two bespoke modular classroom buildings for Park School in Oxfordshire, creating safe, high-quality learning spaces tailored to SEMH needs within a tight 16-week timeframe

    Read More

  • Heathside School (for Marcon Construction), Walton...

    Sector:

    Product: 65 Sq. Metres building providing 2 Classrooms, Teachers Office, & Resource Room along with accessible disabled toilet.

    Read More

See how our portable buildings could benefit you

Contact our friendly team for more information on our full range of buildings and how to start the process of hiring or buying a modular building for your business. Our expert team is always available to give advice, guidance or support.

50 years experience
Industry experts
High quality at great value
Made in the UK
Sustainable buildings
Locally sustainable products
Bespoke buildings
Tailored portable units

Get in Touch



    [utm_source_i][/utm_source_i]
    [utm_medium_i][/utm_medium_i]
    [utm_campaign_i][/utm_campaign_i]
    [utm_term_i][/utm_term_i]
    [utm_content_i][/utm_content_i]

    Speak directly with one of our design team who will answer any questions you have and guide you through the wide range of choices available

    Call Now 01744 851958