Modular Gatehouse and Canteen for GSK

Published: Apr 06 2018

Sector: 
NHS / Healthcare
Building Type: Modular Buildings
Turnaround: 
4 Days
Client: 
GLAXO SMITH KLINE

CLIENT DETAILS:

GSK – Glaxo Smith Kline are a science-led global healthcare company. They research and develop a broad range of innovative products in three primary areas of Pharmaceuticals, Vaccines and Consumer Healthcare.

They also have a significant global presence with commercial operations in more than 150 countries, a network of 86 manufacturing sites in 36 countries and large R&D centres in the UK, USA, Spain, Belgium and China.

 

OVERVIEW:

A project we had previously quoted on, but shelved, was revisited by Contractors to GSK;  SPC Technical Services who were contractors providing a number of on-site improvements for GSK.  Our tender and drawings were put forward and we were recommended to SPC as a supplier GSK would like them to work with.

We were then commissioned by SPC Technical Services to provide an end to end modular gatehouse unit along with a 3 bay modular canteen. The project was fairly unique for Springfield and all units were supplied as “shell” only with SPC supplying and installing all electrics.

 

KEY ISSUES FACED BY CLIENT:

GSK were keen to work with Springfield having previously discussed the project with them some months previously, however, a Contractor had been appointed to carry out on-site improvements and responsible for the new gatehouse and canteen building requirements. It was agreed that SPC should make contact with Springfield and revisit the previous plans and suggestions.

 

WHAT SPRINGFIELD DID:

Springfield re-quoted the supply of the units as “shell only” leaving the electrics and other installation activity to SPC Technical Services.  This suited all parties. All the units were manufactured to the original specification in the Springfield 40,000 sq ft production facility and the delivered to site for fitting-out by SPC. Springfield delivered all units to site and handed over to SPC within 4 days.

 

SUMMARY & KEY BENEFITS:

GSK were eager to use Springfield for the supply of modular building units having been impressed with a previous consultation but had appointed an on-site contractor to handle this type of project.  It was agreed that the new contractor would source the units from Springfield as “shells” for fitting out by their own staff. As a consequence GSK received the buildings they really wanted, SPC controlled the project and Springfield did what they are best at and delivered high quality bespoke modular buildings on time and on budget.

 

© Springfield March 2018

Published: Apr 06 2018

Sector: 
NHS / Healthcare
Building Type: Modular Buildings
Turnaround: 
4 Days

More case studies

Sector:
Commercial
Product:
Modular Buildings

Wilson James are one of the UK’s leading construction logistics providers. They design, plan and deliver a bespoke logistics solution, from the planning and pre-construction phases of a project through to completion. Their need for a Springfield modular building arose when one of their blue-chip clients commissioned them to find a replacement for an existing security building which was no longer fit for purpose.

30th July 2020
Sector:
Commercial
Product:
Modular Buildings

AstraZeneca required additional Staff Amenity space to provide their staff with comfortable facilities to enjoy their work breaks. They were keen to ensure the space was created using high specification internal construction along with the very best equipment available.

17th April 2020
Sector:
Commercial
Product:
Jackleg Buildings

New double storey stacked jack-leg units to provide welfare accommodation, drying facilities, changing areas and a disabled toilet on the ground floor, along with an office and female toilet on the first floor have been installed at Lymm Truck Wash Limited. Additionally, a stand-alone gate house unit was also installed.

21st January 2020

Why choose Springfield

Experience

We have over 40 years’ experience in the portable building industry and know the best way to produce high-quality affordable buildings that meet everyone’s differing needs.

Made in the UK

We are proud of our buildings which are designed, sourced and built in the UK by our on-site dedicated teams.

Bespoke

Our on-site design and production allow us to create your building to your exact specifications - both inside and outside.

Sustainability

Our buildings are manufactured to last, and our building process means that there is less waste than with traditional building methods

Value for money

Our high-quality materials and production methods mean we can offer you great quality modular builds at an exceptional value.

Buy or hire

We give you the option to either buy or hire your building, depending on your needs. We also offer open-ended contracts so you can have more flexibility. 

Contact Us

Contact our friendly team for more information on our full range of buildings and how to start the process of hiring or buying a modular building for your business. Our expert team is always available to give advice, guidance or support.

Springfield Mobile Ltd
Unit 2, 12 Abbotsfield Road,
Sutton,
St Helens,
WA9 4HU

Tel: 01744 851958

Fax: 01744 811565

Download the Springfield brochure

Speak directly with one of our design team who will answer any questions you have and guide you through the wide range of choices available

Call Now 01744 851958