Case Study -
Edgemont Projects Limited for Brawdia Limited

Published: April 29th 2022
Client:

Brawdia Limited

Build Size:

Sector:

Sports & Leisure

Product:

Modular Buildings

Lead Time:

PROJECT: A 4 bay 9.6m x 12m Disaster Recovery, Replacement Multi-use Games Area/Community Building for Stockport Council – providing Home/Away team and Referee changing rooms, fully fitted kitchen, male & female toilets with community space for additional activity and wheelchair access to the building.

CLIENT DETAILS: Following an arson attack on the previous building Stockport Council contacted Phil Barmby at Loss Adjusters Brawdia Limited to source a suitable Contractor to replace the building. Edgemont Projects Limited won the tender to manage the project and appointed Springfield Mobile to build the modular constructed building and install it on-site for connection to all utilities.

OVERVIEW: The building provides brand new accommodation for the surrounding community and the multi-use games area that is a valuable space for the local children and offers a traditional children’s playground, 5 a side football pitch and full 11 a side football pitch. The building was clearly vulnerable to vandalism given the recent arson attack and full intruder and fire alarm equipment was specified along with robust security shutters for all windows and doors.

KEY ISSUES FACED BY CLIENT: A reputable modular building manufacturer was required with the experience of delivering a high-quality unit with attractive, functional yet sturdy internal construction and fittings to cope with regular use and high-spirited occupants along with a safe, secure external feature and all within a keen budget.

WHAT SPRINGFIELD DID: Worked with Edgemont Projects Limited to ensure the building met the detailed and demanding specification, built the 4 bays in our St Helens factory, then delivered and installed at the site which had already been prepared with groundworks and landscaping carried out by Edgemont.

SUMMARY & KEY BENEFITS: A brand new, bespoke unit perfect for the needs of the local community with all required facilities including a fully fitted kitchen is now available for use by the local children ensuring they can spend their days in outdoor activity in a safe secure space. The security features should also prove a deterrent to a vulnerable building when unoccupied.

Related Case Studies


  • Holy Trinity RC Primary School, Nelson. –...

    Sector:

    Product: Holy Trinty RC School required more space for a growing intake and an existing modular classroom needed replacing to create the space. The school were keen to accept as much help as they could get with the project and were delighted when we offered a full turn-key package taking care of all building regulations, groundworks, and all utility connections along with the demolition and removal of the existing building.

    Read More

  • Cormar Carpets, Holme Mill, Ramsbottom, Lancashire

    Sector:

    Product: Cormar Carpets wanted to improve the welfare facilities for their employees and required a bespoke solution. We created a 4-bay, 12M x 12M modular building with staff lockers and full kitchen facilities.

    Read More

  • Gregson Lane Community Centre, Hoghton, Preston

    Sector:

    Product: Gregson Lane Community Centre, based in Hoghton, Preston, required a 12M x 21M, 7-bay modular building to accommodate various daily activities. This large-scale build is fully air-conditioned and features a kitchen, bar, toilets, storeroom and cricket club changing facilities.

    Read More

See how our portable buildings could benefit you

Contact our friendly team for more information on our full range of buildings and how to start the process of hiring or buying a modular building for your business. Our expert team is always available to give advice, guidance or support.

50 years experience
Industry experts
High quality at great value
Made in the UK
Sustainable buildings
Locally sustainable products
Bespoke buildings
Tailored portable units

Get in Touch



    [utm_source_i][/utm_source_i]
    [utm_medium_i][/utm_medium_i]
    [utm_campaign_i][/utm_campaign_i]
    [utm_term_i][/utm_term_i]
    [utm_content_i][/utm_content_i]