Case Study -
Single Unit Nursery Building For Brighter Beginnings

Published: November 26th 2021
Client:

Brighter Beginnings Day Nursery

Build Size:

Sector:

Education

Product:

Portable Cabins

Lead Time:

PROJECT: Brighter Beginnings – Single Unit Nursery building 10.8 x 6 M. Providing single classroom with male & female children toilets and wet area. Built in traditional ivory plastisol with oversize windows to accommodate external visibility for tiny tots!

CLIENT: Brighter Beginnings Day Nursery Fallowfield is rated Outstanding by Ofsted. The nursery is situated behind Wilbraham Primary School in Fallowfield. It is a medium sized setting with a dedicated preschool room where teachers lead activities that are specifically designed to prepare and equip the children with all the skills they will need when moving up to school life.

Brighter Beginnings run a number of units across the Manchester area and this is the 2nd bespoke unit we have built for them.

This unit was required to cope with the growing demand at the Fallowfield site.

OVERVIEW: As the groundworks were provided by a third-party supplier this proved to be a very straightforward job for Springfield as it only required the off-site construction in our St Helens workshop, then the coordination of delivery, installation, and connection to utilities, all completed within a few days.

Installation was carried out during a school half-term break in-line with our safety policy which dictates that we remove the danger posed by construction activity on a school site full of lively, active and curious children.                                                                                                                                                                                                                                                                                   
SUMMARY & KEY BENEFITS: Brighter Beginnings now have a bright, airy and welcoming space which provides a stimulating, custom built   unit fit for purpose that will enable the teachers to deliver the very best introduction for children preparing to start main-stream school.

The building was completed off site reducing any disruption and delivered and fully installed during half term when all children were safely off-site.
 

Related Case Studies


  • Holy Trinity RC Primary School, Nelson. –...

    Sector:

    Product: Holy Trinty RC School required more space for a growing intake and an existing modular classroom needed replacing to create the space. The school were keen to accept as much help as they could get with the project and were delighted when we offered a full turn-key package taking care of all building regulations, groundworks, and all utility connections along with the demolition and removal of the existing building.

    Read More

  • Cormar Carpets, Holme Mill, Ramsbottom, Lancashire

    Sector:

    Product: Cormar Carpets wanted to improve the welfare facilities for their employees and required a bespoke solution. We created a 4-bay, 12M x 12M modular building with staff lockers and full kitchen facilities.

    Read More

  • Gregson Lane Community Centre, Hoghton, Preston

    Sector:

    Product: Gregson Lane Community Centre, based in Hoghton, Preston, required a 12M x 21M, 7-bay modular building to accommodate various daily activities. This large-scale build is fully air-conditioned and features a kitchen, bar, toilets, storeroom and cricket club changing facilities.

    Read More

See how our portable buildings could benefit you

Contact our friendly team for more information on our full range of buildings and how to start the process of hiring or buying a modular building for your business. Our expert team is always available to give advice, guidance or support.

50 years experience
Industry experts
High quality at great value
Made in the UK
Sustainable buildings
Locally sustainable products
Bespoke buildings
Tailored portable units

Get in Touch



    [utm_source_i][/utm_source_i]
    [utm_medium_i][/utm_medium_i]
    [utm_campaign_i][/utm_campaign_i]
    [utm_term_i][/utm_term_i]
    [utm_content_i][/utm_content_i]